JJG Environmental Solutions, llc
Ground Water Treatment and Beneficial Coal Ash Reuse Technologies
Calcium Polysulfide can be injected directly into and under existing Coal Ash storage impoundments, Engineered Landfills and contaminated Ground Water supplies providing immediate reduction of toxic materials and/or immediate treatment of contaminated Ground Water supplies. This method limits surface disruption, avoids movement of hazardous waste, is economically feasible and provides immediate, testable results of successful remediation. Capping in place, landfilling of hazardous materials and drying out of Coal Ash impoundments do not actively address water contamination caused by toxic materials.
Directional Drilling Equipment
Chemical Injection Procedure - Direct Injection and Pipe Placement for multiple injection.
In-Situ (On-Site) Treatment with Calcium Polysulfide will...
-
Chemically stabilize toxic elemental Constituents of Coal Ash
-
Structurally Stabilize Coal Ash Impoundments
-
Remediate Ground Water Contamination